
THE MANUAL
OVERVIEW:
Through easy to follow instructions, DESLUDGE will teach you how to do the following:
1. Determine amount of accumulated sludge.
2. Collect and prepare sludge and soil samples.
3. Prepare regulatory documents for approval of the project.
4. Prepare Daily, Summary, and Final reports.
5. Properly manage the project for greater efficiency.
MANUAL CONTENTS INCLUDE:
-
INTRODUCTION
-
REQUIRED REGULATORY DOCUMENTS
-
SLUDGE MANAGEMENT PLAN
-
PRELIMINARY EPA 40 CFR PART 503 ANALYSIS
-
AS-APPLIED EPA 40 CFR PART 503 ANALYSIS
-
REGULATORY APPROVAL DOCUMENT CHECKLISTS
-
SLUDGE MANAGEMENT PLAN
-
PRELIMINARY EPA 40 CFR PART 503 ANALYSIS
-
SLUDGE VOLUME DETERMINATION
-
LAND ACQUISITION
-
ESTIMATING LAND REQUIREMENTS
-
PROXIMITY TO TREATMENT FACILITY
-
CROP SELECTION
-
LAND AGREEMENT
-
PRELIMINARY SLUDGE & SOIL SAMPLING
-
BUILDING A SLUDGE CORE SAMPLER
-
PRELIMINARY EPA 40 CFR PART 503 ANALYSES
-
TOTAL SOLIDS
-
503 NUTRIENTS
-
503 METALS
-
pH
-
SOUR
-
FECAL COLIFORM
-
PRELIMINARY SLUDGE SAMPLING PROCEDURE
-
PROCESSING PRELIMINARY SLUDGE SAMPLES
-
PRELIMINARY SLUDGE SAMPLES CHAIN OF CUSTODY REPORT
-
PRELIMINARY SOIL SAMPLING PROCEDURE
-
PRELIMINARY SLUDGE TESTING and PRELINIMARY SOILS TESTING
-
RUN OFF PREVENTION
-
SLUDGE REMOVAL EFFICIENCY
-
PROJECT MANAGEMENT
-
DEALING WITH RESIDENCE COMPLAINTS
-
EPA 40 CFR PART 503 AS-APPLIED SLUDGE ANALYSIS
-
AS-APPLIED TOTAL SOLIDS AND 503 NUTRIENTS
-
AS-APPLIED EPA 40 CFR PART 503 ANALYSIS CHECKLIST
-
AS-APPLIED EPA 40 CFR PART 503 SAMPLING
-
AS-APPLIED CHAIN OF CUSTORY REPORT
-
AS-APPLIED SLUDGE LOADING RATE
-
DAILY OPERATIONS AND SUMMARY REPORTS
-
DAILY SLUDGE REMOVAL AND LAND APPLICATION REPORT FORM
-
FINAL REPORT
-
FINAL REPORT FORM
-
POST SOILS ANALYSIS AND LAND OWNER RELEASE FORM